30.04.08:
The demolition of the front part of the Kiel ZOBs has begun. It will disappear now, at least the part of the permanent temporary schonmal of the main train station is facing. On the site immediately after the planned demolition Health center with a hotel and shops arise, and to enable the train station to be redesigned.
07.05.08:
The ramp is gone
13:05:08:
16:05:08:
The front stairwell is gone
19:05:08:
One last little island is still
22:05:08:
The part of the ZOBs to be demolished is now no longer is just a pile of scrap
05/27/2008:
The removing of the construction site is almost completed and it would soon begin the construction work. In the soil was already bored around a bit and the ramp to the parking garage spindle was renovated and equipped with new road patrol. Thus, the park would open again soon be.
04:06:08:
is drilled!